05:50 01 Jan 25
Project:
6830 Solar Power Project by Bangkok Solar Power Co., Ltd.
- Request for post-registration changes
Project | 6830 Solar Power Project by Bangkok Solar Power Co., Ltd. |
---|---|
PRC ref | PRC-6830-001 |
Process track | Issuance |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 15 Oct 12 - 14 Oct 22 |
Assessment opinion | Assessment opinion (220 KB) |
Revised PDD | Revised PDD (800 KB) Revised PDD - track changes (827 KB) |
Supplementary documents |
Appendix 1 - Final MR.pdf (677 KB)
Appendix 2 - Final ER sheet.xls (63 KB) Appendix 3 - Project IRR sheet_Actual project cost.xls (468 KB) Appendix 4 - Revised Ex-ante ER sheet.xls (56 KB) |
Signed form | Signed form (972 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 11 Jul 16 -
Approved
Effective approval date: 11 Jul 16
|
Historic statuses |
10 Jun 16 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: