Project: 6830 Solar Power Project by Bangkok Solar Power Co., Ltd. - Request for post-registration changes
Project 6830 Solar Power Project by Bangkok Solar Power Co., Ltd.
PRC ref PRC-6830-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 15 Oct 2012 - 31 Oct 2012

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 15 Oct 12 - 14 Oct 22
Assessment opinion Assessment opinion (220 KB)
Revised PDD Revised PDD (800 KB)   Revised PDD - track changes (827 KB)
Supplementary documents Appendix 1 - Final MR.pdf (677 KB)
Appendix 2 - Final ER sheet.xls (63 KB)
Appendix 3 - Project IRR sheet_Actual project cost.xls (468 KB)
Appendix 4 - Revised Ex-ante ER sheet.xls (56 KB)
Signed form Signed form (972 KB)
DOE clarification
VVS version VVS 2.0
Current status 11 Jul 16 - Approved
Effective approval date: 11 Jul 16
Historic statuses 10 Jun 16 - Request published