Project: 2556 Bangna Starch Wastewater Treatment and Biogas Utilization Project - Request for post-registration changes
Project 2556 Bangna Starch Wastewater Treatment and Biogas Utilization Project
PRC ref PRC-2556-001
Process track Issuance
DOE 4KES
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 18 Apr 2017 - 20 Feb 2020
Assessment opinion Assessment opinion (696 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (144 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 29 Sep 22 - Approved
Effective approval date: 29 Sep 22
Historic statuses 31 Aug 22 - Request published