Project: 5067 Improved Cooking Stoves for Nigeria Programme of Activities - Request for post-registration changes
Project 5067 Improved Cooking Stoves for Nigeria Programme of Activities
PRC ref PRC-5067-002
Process track Prior approval
DOE CTI Certification
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Addition or change of technologies/measures with or without addition or change of applied methodologies
Applicable crediting period 10 Nov 11 - 09 Nov 18
Assessment opinion Assessment opinion (302 KB)
Revised PDD Revised PDD (511 KB)   Revised PDD - track changes (569 KB)
Supplementary documents Appendix 1 - CER_Calculation_DOE_CPA5_PRC.xls (66 KB)
Appendix 2 - FW Notification - change of start date of crediting period_CPA 5067-0005.msg (40 KB)
Signed form Signed form (27 KB)
DOE clarification DOE clarification 1 - sample size calculation approaches 1-3 CPA 5_PRC_12.01.2018.xlsx (113 KB)
DOE clarification 2 - PoA5067_CPA5_PRC_FValR 20190131.pdf (175 KB)
DOE clarification 3 - PoA5067_CPA5_PRC_FValR 20190409 tc_track change.pdf (338 KB)
DOE clarification 4 - PoA5067_CPA5_PRC_FValR 20190409 tc_clean.pdf (302 KB)
DOE clarification 5 - Post-registration changes notification form_PoA5067-CPA5_updated_wrapper.pdf (33 KB)
VVS version VVS-PoA 2.0
Current status 20 Jun 19 - Rejected
Effective rejection date: 14 Jun 19. Reason (116 KB)
Historic statuses 06 Mar 19 - Published
18 Apr 19 - Awaiting DOE clarifications
22 Apr 19 - DOE clarifications received
22 Apr 19 - Summary note being prepared
20 Jun 19 - Request added to EB103 meeting agenda