Project: 4176 Ibi Batéké degraded savannah afforestation project for fuelwood production (Democratic Republic of Congo) - Request for post-registration changes
Project 4176 Ibi Batéké degraded savannah afforestation project for fuelwood production (Democratic Republic of Congo)
PRC ref PRC-4176-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Jul 08 - 30 Jun 38
Assessment opinion Assessment opinion (332 KB)
Revised PDD Revised PDD (2774 KB)   Revised PDD - track changes (2818 KB)
Supplementary documents Appendix 1 - Appendix 1 TARAM V1.3_BATEKE_R.D.CONGO_200709_1.xlsx (8391 KB)
Appendix 2 - Appendix 2 TARAM V1.3_BATEKE_R.D.CONGO_200709_2..xlsx (8398 KB)
Appendix 3 - Appendix 3 TARAM V1.3_BATEKE_R.D.CONGO_200709_3.xlsx (8398 KB)
Appendix 4 - Appendix 4 TARAM V1.3_BATEKE_R.D.CONGO_200709_4.xlsx (8457 KB)
Appendix 5 - CERs_TOTAL_200709 rev1.xls (73 KB)
Signed form Signed form (52 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 23 Aug 18 - Approved
Effective approval date: 22 Aug 18
Historic statuses 23 Jul 18 - Published
23 Jul 18 - Summary note being prepared
02 Aug 18 - Awaiting EB decision