Project: 9003 LMEL 25 MW Waste Heat based Captive Power Plant. - Request for post-registration changes
Project 9003 LMEL 25 MW Waste Heat based Captive Power Plant.
PRC ref PRC-9003-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 27 May 13 - 26 May 23
Assessment opinion Assessment opinion (1190 KB)
Revised PDD Revised PDD (573 KB)   Revised PDD - track changes (717 KB)
Supplementary documents
Signed form Signed form (42 KB)
DOE clarification
VVS version VVS 7.0
Current status 29 Mar 16 - Approved
Effective approval date: 29 Mar 16
Historic statuses 25 Feb 16 - Request published