Project: 3809 Jeju special self-governing province Wind Power Project - Request for post-registration changes
Project 3809 Jeju special self-governing province Wind Power Project
PRC ref PRC-3809-002
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 12 Apr 12 - 11 Apr 22
Assessment opinion Assessment opinion (215 KB)
Revised PDD Revised PDD (2033 KB)   Revised PDD - track changes (2051 KB)
Supplementary documents Appendix 1 - Appendix 1. The electricity generation test operation reports.pdf (2183 KB)
Appendix 2 - Appendix 2. Nameplates.pdf (880 KB)
Appendix 3 - Appendix 3. Training Records.pdf (462 KB)
Appendix 4 - Appendix 4. Power market operation regulation.pdf (83 KB)
Appendix 5 - Appendix 5. Measures Act.pdf (307 KB)
Appendix 6 - Appendix 6. Revision point of internal calibration regulation of KEPCO.pdf (488 KB)
Appendix 7 - Appendix 7_Construction completion documents by three manufactures_public.pdf (883 KB)
Signed form Signed form (688 KB)
DOE clarification
VVS version VVS 2.0
Current status 18 Oct 13 - Approved
Effective approval date: 18 Oct 13
Historic statuses 19 Sep 13 - Request published