09:00 21 Dec 25
Project:
3809 Jeju special self-governing province Wind Power Project
- Request for post-registration changes
| Project | 3809 Jeju special self-governing province Wind Power Project |
|---|---|
| PRC ref | PRC-3809-002 |
| Process track | Issuance |
| DOE | DTSUS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 12 Apr 12 - 11 Apr 22 |
| Assessment opinion |
Assessment opinion (215 KB)
|
| Revised PDD |
Revised PDD (2033 KB)
Revised PDD - track changes (2051 KB)
|
| Supplementary documents |
Appendix 1 - Appendix 1. The electricity generation test operation reports.pdf (2183 KB)
Appendix 2 - Appendix 2. Nameplates.pdf (880 KB)
Appendix 3 - Appendix 3. Training Records.pdf (462 KB)
Appendix 4 - Appendix 4. Power market operation regulation.pdf (83 KB)
Appendix 5 - Appendix 5. Measures Act.pdf (307 KB)
Appendix 6 - Appendix 6. Revision point of internal calibration regulation of KEPCO.pdf (488 KB)
Appendix 7 - Appendix 7_Construction completion documents by three manufactures_public.pdf (883 KB)
|
| Signed form |
Signed form (688 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 18 Oct 13 -
Approved
Effective approval date: 18 Oct 13
|
| Historic statuses |
19 Sep 13 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: