Project: 4274 SF6 recovery and reclamation project, South Korea - Request for post-registration changes
Project 4274 SF6 recovery and reclamation project, South Korea
PRC ref PRC-4274-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Apr 2011 - 30 Sep 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Apr 11 - 31 Mar 21
Assessment opinion Assessment opinion (763 KB)
Revised PDD Revised PDD (659 KB)   Revised PDD - track changes (651 KB)
Supplementary documents Appendix 1 - 4274 1 Deviation Explanation.pdf (99 KB)
Signed form Signed form (51 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 27 Aug 13
Historic statuses 23 Jul 13 - Published
23 Jul 13 - Summary note being prepared
06 Aug 13 - Awaiting EB decision