Project: 2483 Inner Mongolia Wuliji Wind Farm Project - Request for post-registration changes
Project 2483 Inner Mongolia Wuliji Wind Farm Project
PRC ref PRC-2483-001
Process track Prior approval
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 15 Mar 10 - 14 Mar 17
Assessment opinion Assessment opinion (155 KB)
Revised PDD Revised PDD (805 KB)   Revised PDD - track changes (668 KB)
Supplementary documents
Signed form Signed form (118 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Sep 13 - Approved
Effective approval date: 20 Sep 13
Historic statuses 13 Aug 13 - Published
13 Aug 13 - Summary note being prepared
30 Aug 13 - Awaiting EB decision