Project: 4724 Sichuan Lingguan 76MW Hydropower Project - Request for post-registration changes
Project 4724 Sichuan Lingguan 76MW Hydropower Project
PRC ref PRC-4724-001
Process track Prior approval
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Oct 11 - 30 Sep 18
Assessment opinion Assessment opinion (473 KB)
Revised PDD Revised PDD (1035 KB)   Revised PDD - track changes (1088 KB)
Supplementary documents
Signed form Signed form (2010 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 Dec 12 - Approved
Effective approval date: 06 Dec 12
Historic statuses 06 Nov 12 - Published
06 Nov 12 - Summary note being prepared
15 Nov 12 - Awaiting EB decision