Project: 0091 Landfill Gas to Energy Project at Lara Landfill, Mauá, Brazil - Request for post-registration changes
Project 0091 Landfill Gas to Energy Project at Lara Landfill, Mauá, Brazil
PRC ref PRC-0091-002
Process track Prior approval
DOE GLC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 15 Sep 06 - 14 Sep 13
Assessment opinion Assessment opinion (236 KB)
Revised PDD Revised PDD (1705 KB)   Revised PDD - track changes (1893 KB)
Supplementary documents Appendix 1 - Lara Annex Financial calculation-PDD Annex-Dec. 2013.xls (94 KB)
Signed form Signed form (475 KB)
DOE clarification
VVS version VVS 2.0
Current status 08 Jul 14 - Approved
Effective approval date: 08 Jul 14
Historic statuses 03 Jun 14 - Published
03 Jun 14 - Summary note being prepared
17 Jun 14 - Awaiting EB decision