11:38 11 Jan 25
Project:
0091 Landfill Gas to Energy Project at Lara Landfill, Mauá, Brazil
- Request for post-registration changes
Project | 0091 Landfill Gas to Energy Project at Lara Landfill, Mauá, Brazil |
---|---|
PRC ref | PRC-0091-002 |
Process track | Prior approval |
DOE | GLC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 15 Sep 06 - 14 Sep 13 |
Assessment opinion | Assessment opinion (236 KB) |
Revised PDD | Revised PDD (1705 KB) Revised PDD - track changes (1893 KB) |
Supplementary documents |
Appendix 1 - Lara Annex Financial calculation-PDD Annex-Dec. 2013.xls (94 KB)
|
Signed form | Signed form (475 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 08 Jul 14 -
Approved
Effective approval date: 08 Jul 14
|
Historic statuses |
03 Jun 14 -
Published 03 Jun 14 - Summary note being prepared 17 Jun 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: