Project: 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia - Request for post-registration changes
Project 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia
PRC ref PRC-7245-003
Process track Issuance
DOE TÜV SÜD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2020 - 31 Dec 2020
Assessment opinion Assessment opinion (1389 KB)
Revised PDD  
Supplementary documents Appendix 1 - 7245_PRC validation report_round 1_29052025_TC.pdf (1395 KB)
Signed form Signed form (157 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 19 Aug 25 - Approved
Effective approval date: 19 Aug 25
Historic statuses 21 Jul 25 - Request published