Project:
7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia
- Request for post-registration changes
Project | 7245 Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia |
---|---|
PRC ref | PRC-7245-003 |
Process track | Issuance |
DOE | TÜV SÜD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
|
Assessment opinion |
![]() |
Revised PDD | |
Supplementary documents |
![]() |
Signed form |
![]() |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 19 Aug 25 -
Approved
Effective approval date: 19 Aug 25
|
Historic statuses |
21 Jul 25 -
Request published |