Project: 6283 Distribution of fuel-efficient improved cooking stoves in Nigeria - Request for post-registration changes
Project 6283 Distribution of fuel-efficient improved cooking stoves in Nigeria
PRC ref PRC-6283-005
Process track Renewal
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Geographical boundary of the PoA is expanded within the host Party or to include one or more host Parties
Applicable crediting period 07 Nov 19 - 06 Nov 26
Assessment opinion Assessment opinion (726 KB)
Revised PDD   Revised PDD - track changes (1134 KB)
Supplementary documents Appendix 1 - Nigeria PoA DD_version 14 - resubmission post I&R check review (TC).pdf (2333 KB)
Appendix 2 - CCIPL 729_PRC PoA FVR_TC.pdf (728 KB)
Signed form Signed form (154 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 23 Sep 21 - Approved
Effective approval date: 23 Sep 21
Historic statuses 25 Aug 21 - Request published