23:15 14 Nov 25
Project:
0239 Wigton Wind Farm Project (WWF)
- Request for post-registration changes
| Project | 0239 Wigton Wind Farm Project (WWF) |
|---|---|
| PRC ref | PRC-0239-001 |
| Process track | Issuance |
| DOE | TUV RHEIN |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 29 Apr 04 - 28 Apr 14 |
| Assessment opinion |
Assessment opinion (576 KB)
|
| Revised PDD |
Revised PDD (705 KB)
Revised PDD - track changes (1082 KB)
|
| Supplementary documents |
Appendix 1 - Electricity Meters Accuracy WWF (Extract from PPA).pdf (56 KB)
|
| Signed form |
Signed form (969 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 27 Jun 13 -
Approved
Effective approval date: 27 Jun 13
|
| Historic statuses |
29 May 13 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: