23:41 26 Jan 25
Project:
0239 Wigton Wind Farm Project (WWF)
- Request for post-registration changes
Project | 0239 Wigton Wind Farm Project (WWF) |
---|---|
PRC ref | PRC-0239-001 |
Process track | Issuance |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 29 Apr 04 - 28 Apr 14 |
Assessment opinion | Assessment opinion (576 KB) |
Revised PDD | Revised PDD (705 KB) Revised PDD - track changes (1082 KB) |
Supplementary documents |
Appendix 1 - Electricity Meters Accuracy WWF (Extract from PPA).pdf (56 KB)
|
Signed form | Signed form (969 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 27 Jun 13 -
Approved
Effective approval date: 27 Jun 13
|
Historic statuses |
29 May 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: