Project: 0239 Wigton Wind Farm Project (WWF) - Request for post-registration changes
Project 0239 Wigton Wind Farm Project (WWF)
PRC ref PRC-0239-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 29 Apr 04 - 28 Apr 14
Assessment opinion Assessment opinion (576 KB)
Revised PDD Revised PDD (705 KB)   Revised PDD - track changes (1082 KB)
Supplementary documents Appendix 1 - Electricity Meters Accuracy WWF (Extract from PPA).pdf (56 KB)
Signed form Signed form (969 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Jun 13 - Approved
Effective approval date: 27 Jun 13
Historic statuses 29 May 13 - Request published