Project: 1424 Carhuaquero IV Hydroelectric Power Plant - Request for post-registration changes
Project 1424 Carhuaquero IV Hydroelectric Power Plant
PRC ref PRC-1424-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2009 - 31 Dec 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 03 May 08 - 02 May 15
Assessment opinion Assessment opinion (712 KB)
Revised PDD Revised PDD (1810 KB)   Revised PDD - track changes (3005 KB)
Supplementary documents Appendix 1 - Carhuaquero IV EGh 1 Jan 2009 - 31 Dec 2009 deviation.zip (5565 KB)
Appendix 2 - Carhuaquero IV EGh 1 Jan 2010 - 31 Dec 2010deviation.zip (5694 KB)
Appendix 3 - Carhuaquero IV EGh 1 Jan 2011 - 31 Dec 2011deviation.zip (5642 KB)
Appendix 4 - DQA Report P13-0142#1 ed.0 ENGLISH.pdf (193 KB)
Signed form Signed form (1367 KB)
DOE clarification
VVS version VVS 2.0
Current status 04 Apr 14 - Approved
Effective approval date: 04 Apr 14
Historic statuses 04 Mar 14 - Published
04 Mar 14 - Summary note being prepared
14 Mar 14 - Awaiting EB decision