20:47 19 Nov 25
Project:
10320 Scaling-Up Solar Photovoltaic Power Generation
- Request for post-registration changes
| Project | 10320 Scaling-Up Solar Photovoltaic Power Generation |
|---|---|
| PRC ref | PRC-10320-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Changes to the project or programme design
|
| Applicable crediting period | 14 Nov 16 - 13 Nov 23 |
| Assessment opinion |
Assessment opinion (485 KB)
|
| Revised PDD |
Revised PDD (537 KB)
Revised PDD - track changes (566 KB)
|
| Supplementary documents |
Appendix 1 - HCA Nigeria page 1.JPG (117 KB)
Appendix 2 - HCA Nigeria page 2.JPG (73 KB) |
| Signed form |
Signed form (1432 KB)
|
| DOE clarification |
DOE clarification 1 - PoA10320_PRC_Assessment opinion_ver1.2.pdf (485 KB)
|
| VVS version | VVS-PoA 1.0 |
| Current status | 09 May 18 -
Approved
Effective approval date: 08 May 18
|
| Historic statuses |
26 Mar 18 -
Published 06 Apr 18 - Awaiting DOE clarifications 10 Apr 18 - DOE clarifications received 10 Apr 18 - Summary note being prepared 18 Apr 18 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: