Project: 1569 Taohua 9MW Hydro Power Project in Guizhou Province, China - Request for post-registration changes
Project 1569 Taohua 9MW Hydro Power Project in Guizhou Province, China
PRC ref PRC-1569-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 12 Jun 08 - 11 Jun 15
Assessment opinion Assessment opinion (479 KB)
Revised PDD Revised PDD (757 KB)   Revised PDD - track changes (853 KB)
Supplementary documents
Signed form Signed form (1911 KB)
DOE clarification
VVS version VVS 2.0
Current status 01 Feb 13 - Approved
Effective approval date: 01 Feb 13
Historic statuses 03 Jan 13 - Request published