Project: 3827 Bundled Hadong-Busan photovoltaic Power Project of The Korea Southern Power Corporation (1MW Hadong Photovoltaic Power + 0.39MW Busan Photovoltaic Power, Bundling Project) - Request for post-registration changes
Project 3827 Bundled Hadong-Busan photovoltaic Power Project of The Korea Southern Power Corporation (1MW Hadong Photovoltaic Power + 0.39MW Busan Photovoltaic Power, Bundling Project)
PRC ref PRC-3827-001
Process track Issuance
DOE KFQ
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 18 Dec 2010 - 31 Dec 2016

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 18 Dec 10 - 17 Dec 20
Assessment opinion Assessment opinion (720 KB)
Revised PDD Revised PDD (2541 KB)   Revised PDD - track changes (2547 KB)
Supplementary documents Appendix 1 - Estimated emission reduction sheet_ver.02.xlsx (21 KB)
Signed form Signed form (1394 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 20 Mar 18 - Approved
Effective approval date: 20 Mar 18
Historic statuses 19 Feb 18 - Request published