Project:
3827 Bundled Hadong-Busan photovoltaic Power Project of The Korea Southern Power Corporation (1MW Hadong Photovoltaic Power + 0.39MW Busan Photovoltaic Power, Bundling Project)
- Request for post-registration changes
| Project | 3827 Bundled Hadong-Busan photovoltaic Power Project of The Korea Southern Power Corporation (1MW Hadong Photovoltaic Power + 0.39MW Busan Photovoltaic Power, Bundling Project) |
|---|---|
| PRC ref | PRC-3827-001 |
| Process track | Issuance |
| DOE | KFQ |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 18 Dec 10 - 17 Dec 20 |
| Assessment opinion |
Assessment opinion (720 KB)
|
| Revised PDD |
Revised PDD (2541 KB)
Revised PDD - track changes (2547 KB)
|
| Supplementary documents |
Appendix 1 - Estimated emission reduction sheet_ver.02.xlsx (21 KB)
|
| Signed form |
Signed form (1394 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 1.0 |
| Current status | 20 Mar 18 -
Approved
Effective approval date: 20 Mar 18
|
| Historic statuses |
19 Feb 18 -
Request published |

Assessment opinion