Project: 10188 Itezhi Tezhi Hydro Power - Request for post-registration changes
Project 10188 Itezhi Tezhi Hydro Power
PRC ref PRC-10188-001
Process track Issuance
DOE Carbon Check
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 24 May 16 - 23 May 26
Assessment opinion Assessment opinion (463 KB)
Revised PDD Revised PDD (951 KB)   Revised PDD - track changes (821 KB)
Supplementary documents
Signed form Signed form (2355 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 14 Dec 18 - Approved
Effective approval date: 14 Dec 18
Historic statuses 15 Nov 18 - Request published