19:41 07 Jan 25
Project:
4818 24 MW Dummagudem Hydel project by SLS Power Corporation Limited
- Request for post-registration changes
Project | 4818 24 MW Dummagudem Hydel project by SLS Power Corporation Limited |
---|---|
PRC ref | PRC-4818-001 |
Process track | Prior approval |
DOE | TUV RHEIN |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Change to the start date of the crediting period
|
Applicable crediting period | 10 Oct 13 - 09 Oct 23 |
Assessment opinion | Assessment opinion (453 KB) |
Revised PDD | Revised PDD (922 KB) Revised PDD - track changes (923 KB) |
Supplementary documents |
Appendix 1 - 4818 CER Calculation.xlsx (15 KB)
Appendix 2 - PDD_SLS_VVS version 04.pdf (906 KB) |
Signed form | Signed form (940 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 25 Aug 14 -
Approved
Effective approval date: 20 Aug 14
|
Historic statuses |
22 Jul 14 -
Published 22 Jul 14 - Summary note being prepared 30 Jul 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: