Project: 4818 24 MW Dummagudem Hydel project by SLS Power Corporation Limited - Request for post-registration changes
Project 4818 24 MW Dummagudem Hydel project by SLS Power Corporation Limited
PRC ref PRC-4818-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Change to the start date of the crediting period
  • Proposed start date of crediting period: 10 Oct 2013
Applicable crediting period 10 Oct 13 - 09 Oct 23
Assessment opinion Assessment opinion (453 KB)
Revised PDD Revised PDD (922 KB)   Revised PDD - track changes (923 KB)
Supplementary documents Appendix 1 - 4818 CER Calculation.xlsx (15 KB)
Appendix 2 - PDD_SLS_VVS version 04.pdf (906 KB)
Signed form Signed form (940 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Aug 14 - Approved
Effective approval date: 20 Aug 14
Historic statuses 22 Jul 14 - Published
22 Jul 14 - Summary note being prepared
30 Jul 14 - Awaiting EB decision