Project: 8599 Shandong Huimin Biomass Utilization Project - Request for post-registration changes
Project 8599 Shandong Huimin Biomass Utilization Project
PRC ref PRC-8599-001
Process track Issuance
DOE PJRCES
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 11 Dec 12 - 10 Dec 19
Assessment opinion Assessment opinion (2032 KB)
Revised PDD Revised PDD (1190 KB)   Revised PDD - track changes (2916 KB)
Supplementary documents
Signed form Signed form (120 KB)
DOE clarification
VVS version VVS 2.0
Current status 20 Feb 15 - Approved
Effective approval date: 20 Feb 15
Historic statuses 22 Jan 15 - Request published