11:18 24 Oct 25
Project:
1015 25.70 MW Bundled Wind Power Project in Udumalpet, Tamilnadu
- Request for post-registration changes
| Project | 1015 25.70 MW Bundled Wind Power Project in Udumalpet, Tamilnadu |
|---|---|
| PRC ref | PRC-1015-001 |
| Process track | Prior approval |
| DOE | TÜV NORD |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 24 Jun 05 - 23 Jun 15 |
| Assessment opinion |
Assessment opinion (658 KB)
|
| Revised PDD |
Revised PDD (673 KB)
Revised PDD - track changes (725 KB)
|
| Supplementary documents |
Appendix 1 - 1015_IRR Calculation-rev.xlsx (44 KB)
|
| Signed form |
Signed form (103 KB)
|
| DOE clarification |
DOE clarification 1 - 1015 Assessment Opinion_CLA.pdf (658 KB)
DOE clarification 2 - 1015 Revised PDD_CLA.pdf (673 KB)
DOE clarification 3 - 1015 Revised PDD_tracked changes_CLA.pdf (725 KB)
DOE clarification 4 - 1015_IRR Calculation-rev.xlsx (44 KB) |
| VVS version | VVS 2.0 |
| Current status | 13 Jun 14 -
Approved
Effective approval date: 11 Jun 14
|
| Historic statuses |
04 Mar 14 -
Published 25 Mar 14 - Awaiting DOE clarifications 08 Apr 14 - DOE clarifications received 08 Apr 14 - Summary note being prepared 21 May 14 - Awaiting EB decision |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: