Project: 1015 25.70 MW Bundled Wind Power Project in Udumalpet, Tamilnadu - Request for post-registration changes
Project 1015 25.70 MW Bundled Wind Power Project in Udumalpet, Tamilnadu
PRC ref PRC-1015-001
Process track Prior approval
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 24 Jun 05 - 23 Jun 15
Assessment opinion Assessment opinion (658 KB)
Revised PDD Revised PDD (673 KB)   Revised PDD - track changes (725 KB)
Supplementary documents Appendix 1 - 1015_IRR Calculation-rev.xlsx (44 KB)
Signed form Signed form (103 KB)
DOE clarification DOE clarification 1 - 1015 Assessment Opinion_CLA.pdf (658 KB)
DOE clarification 2 - 1015 Revised PDD_CLA.pdf (673 KB)
DOE clarification 3 - 1015 Revised PDD_tracked changes_CLA.pdf (725 KB)
DOE clarification 4 - 1015_IRR Calculation-rev.xlsx (44 KB)
VVS version VVS 2.0
Current status 13 Jun 14 - Approved
Effective approval date: 11 Jun 14
Historic statuses 04 Mar 14 - Published
25 Mar 14 - Awaiting DOE clarifications
08 Apr 14 - DOE clarifications received
08 Apr 14 - Summary note being prepared
21 May 14 - Awaiting EB decision