19:45 25 Jan 25
Project:
1015 25.70 MW Bundled Wind Power Project in Udumalpet, Tamilnadu
- Request for post-registration changes
Project | 1015 25.70 MW Bundled Wind Power Project in Udumalpet, Tamilnadu |
---|---|
PRC ref | PRC-1015-001 |
Process track | Prior approval |
DOE | TÜV NORD |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 24 Jun 05 - 23 Jun 15 |
Assessment opinion | Assessment opinion (658 KB) |
Revised PDD | Revised PDD (673 KB) Revised PDD - track changes (725 KB) |
Supplementary documents |
Appendix 1 - 1015_IRR Calculation-rev.xlsx (44 KB)
|
Signed form | Signed form (103 KB) |
DOE clarification |
DOE clarification 1 - 1015 Assessment Opinion_CLA.pdf (658 KB)
DOE clarification 2 - 1015 Revised PDD_CLA.pdf (673 KB) DOE clarification 3 - 1015 Revised PDD_tracked changes_CLA.pdf (725 KB) DOE clarification 4 - 1015_IRR Calculation-rev.xlsx (44 KB) |
VVS version | VVS 2.0 |
Current status | 13 Jun 14 -
Approved
Effective approval date: 11 Jun 14
|
Historic statuses |
04 Mar 14 -
Published 25 Mar 14 - Awaiting DOE clarifications 08 Apr 14 - DOE clarifications received 08 Apr 14 - Summary note being prepared 21 May 14 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: