Project: 4679 Kohinoor Wind Power Project in Rajasthan - Request for post-registration changes
Project 4679 Kohinoor Wind Power Project in Rajasthan
PRC ref PRC-4679-001
Process track Issuance
DOE KBS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 25 Apr 11 - 24 Apr 21
Assessment opinion Assessment opinion (393 KB)
Revised PDD Revised PDD (689 KB)   Revised PDD - track changes (829 KB)
Supplementary documents
Signed form Signed form (1308 KB)
DOE clarification
VVS version VVS 2.0
Current status 02 Apr 13 - Approved
Effective approval date: 02 Apr 13
Historic statuses 01 Mar 13 - Request published