Project: 2645 Wastewater Treatment with Biogas Technology in a Tapioca Processing Plant at Roi Et Flour Company Limited, Thailand - Request for post-registration changes
Project 2645 Wastewater Treatment with Biogas Technology in a Tapioca Processing Plant at Roi Et Flour Company Limited, Thailand
PRC ref PRC-2645-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 05 Sep 2009 - 30 Jun 2012
Assessment opinion Assessment opinion (210 KB)
Revised PDD  
Supplementary documents Appendix 1 - MR-2645-Roiet monitoring calc 120530.xls (5072 KB)
Appendix 2 - Roi Et density of sludge.pdf (342 KB)
Appendix 3 - Roi et list of auxiliary load.xls (315 KB)
Appendix 4 - Roi Et Single line diagram.pdf (89 KB)
Appendix 5 - Sludge removal record 2009 with translation.pdf (57 KB)
Signed form Signed form (212 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Oct 12 - Approved
Effective approval date: 09 Oct 12
Historic statuses 10 Sep 12 - Published
10 Sep 12 - Summary note being prepared
18 Sep 12 - Awaiting EB decision