Project:
0570 11.35 MW Grid Connected Wind Electricity Project at Pohra (Rajasthan) in India
- Request for post-registration changes
Project | 0570 11.35 MW Grid Connected Wind Electricity Project at Pohra (Rajasthan) in India |
---|---|
PRC ref | PRC-0570-001 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 29 Sep 03 - 28 Sep 13 |
Assessment opinion | Assessment opinion (134 KB) |
Revised PDD | Revised PDD (481 KB) Revised PDD - track changes (514 KB) |
Supplementary documents | |
Signed form | Signed form (1306 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 25 Apr 13 -
Approved
Effective approval date: 25 Apr 13
|
Historic statuses |
27 Mar 13 -
Request published |