Project: 0570 11.35 MW Grid Connected Wind Electricity Project at Pohra (Rajasthan) in India - Request for post-registration changes
Project 0570 11.35 MW Grid Connected Wind Electricity Project at Pohra (Rajasthan) in India
PRC ref PRC-0570-001
Process track Issuance
DOE BVI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 29 Sep 03 - 28 Sep 13
Assessment opinion Assessment opinion (134 KB)
Revised PDD Revised PDD (481 KB)   Revised PDD - track changes (514 KB)
Supplementary documents
Signed form Signed form (1306 KB)
DOE clarification
VVS version VVS 2.0
Current status 25 Apr 13 - Approved
Effective approval date: 25 Apr 13
Historic statuses 27 Mar 13 - Request published