12:18 26 Oct 25
Project:
2643 ID08-WWP-10, Methane Recovery in Wastewater Treatment, West Sumatera, Indonesia
- Request for post-registration changes
| Project | 2643 ID08-WWP-10, Methane Recovery in Wastewater Treatment, West Sumatera, Indonesia |
|---|---|
| PRC ref | PRC-2643-001 |
| Process track | Issuance |
| DOE | DNV |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
|
| Applicable crediting period | 12 Nov 09 - 11 Nov 16 |
| Assessment opinion |
Assessment opinion (243 KB)
|
| Revised PDD |
Revised PDD (653 KB)
Revised PDD - track changes (417 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (211 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 28 Dec 12 -
Approved
Effective approval date: 28 Dec 12
|
| Historic statuses |
29 Nov 12 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: