Project: 4937 Anhanguera Hydro Power Project - Request for post-registration changes
Project 4937 Anhanguera Hydro Power Project
PRC ref PRC-4937-001
Process track Prior approval
DOE GLC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Jan 12 - 31 Dec 21
Assessment opinion Assessment opinion (261 KB)
Revised PDD Revised PDD (1827 KB)   Revised PDD - track changes (2512 KB)
Supplementary documents Appendix 1 - 4937 Financials and CER Calculation.xls (528 KB)
Appendix 2 - CLEAN_PDD_CALCULATION.xls (16 KB)
Signed form Signed form (375 KB)
DOE clarification DOE clarification 1 - 349 1_Post_registration_changes_assessment report_ver 11_FA TRACK.pdf (419 KB)
VVS version VVS 2.0
Current status 24 Feb 15 - Approved
Effective approval date: 20 Feb 15
Historic statuses 12 Aug 14 - Published
17 Sep 14 - Awaiting DOE clarifications
19 Jan 15 - DOE clarifications received
19 Jan 15 - Summary note being prepared
30 Jan 15 - Awaiting EB decision