Project: 9954 Santa Teresa Hydropower Plant - Request for post-registration changes
Project 9954 Santa Teresa Hydropower Plant
PRC ref PRC-9954-001
Process track Prior approval
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Addition of new components or extension/addition of technologies/measures that introduce:, Complementary technologies/measures, Actual operational parameters differ from the expected parameters
Applicable crediting period 01 Sep 15 - 31 Aug 22
Assessment opinion Assessment opinion (730 KB)
Revised PDD Revised PDD (2290 KB)   Revised PDD - track changes (2549 KB)
Supplementary documents
Signed form Signed form (290 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 16 Jan 24 - Approved
Effective approval date: 15 Jan 24
Historic statuses 28 Nov 23 - Published
12 Dec 23 - Awaiting DOE clarifications
18 Dec 23 - DOE clarifications received
18 Dec 23 - Summary note being prepared
26 Dec 23 - Awaiting EB decision