Project: 2770 1.5 MW Grid connected Wind Electricity Generation at Tirunelveli District, Tamilnadu, India by Kallam Agro Products and Oils Private Limited - Request for post-registration changes
Project 2770 1.5 MW Grid connected Wind Electricity Generation at Tirunelveli District, Tamilnadu, India by Kallam Agro Products and Oils Private Limited
PRC ref PRC-2770-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 15 Dec 09 - 14 Dec 19
Assessment opinion Assessment opinion (476 KB)
Revised PDD Revised PDD (703 KB)   Revised PDD - track changes (706 KB)
Supplementary documents
Signed form Signed form (87 KB)
DOE clarification
VVS version VVS 2.0
Current status 09 Sep 13 - Approved
Effective approval date: 20 Aug 13
Historic statuses 16 Jul 13 - Published
16 Jul 13 - Summary note being prepared
30 Jul 13 - Awaiting EB decision