Project: 9402 3 MW Wind power project in Madhyapradesh - Request for post-registration changes
Project 9402 3 MW Wind power project in Madhyapradesh
PRC ref PRC-9402-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jan 13 - 31 Dec 19
Assessment opinion Assessment opinion (121 KB)
Revised PDD Revised PDD (2963 KB)   Revised PDD - track changes (2984 KB)
Supplementary documents
Signed form Signed form (77 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 24 Mar 22 - Approved
Effective approval date: 24 Mar 22
Historic statuses 23 Feb 22 - Request published