07:06 16 May 24
Project:
9402 3 MW Wind power project in Madhyapradesh
- Request for post-registration changes
Project | 9402 3 MW Wind power project in Madhyapradesh |
---|---|
PRC ref | PRC-9402-001 |
Process track | Issuance |
DOE | LGAI Tech. Center S.A |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Permanent changes from the monitoring plan or the monitoring methodology
|
Applicable crediting period | 01 Jan 13 - 31 Dec 19 |
Assessment opinion | Assessment opinion (121 KB) |
Revised PDD | Revised PDD (2963 KB) Revised PDD - track changes (2984 KB) |
Supplementary documents | |
Signed form | Signed form (77 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 24 Mar 22 -
Approved
Effective approval date: 24 Mar 22
|
Historic statuses |
23 Feb 22 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: