Project: 0378 Xiaogushan Hydropower Project in People's Republic of China - Request for post-registration changes
Project 0378 Xiaogushan Hydropower Project in People's Republic of China
PRC ref PRC-0378-001
Process track Prior approval
DOE JACO
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 11 Aug 06 - 10 Aug 16
Assessment opinion Assessment opinion (994 KB)
Revised PDD Revised PDD (1410 KB)   Revised PDD - track changes (1424 KB)
Supplementary documents Appendix 1 - 0378_Xiaogushan Financial Model_20130709.xls (197 KB)
Appendix 2 - Xiaogushan Emission Reduction.xls (81 KB)
Signed form Signed form (1280 KB)
DOE clarification
VVS version VVS 2.0
Current status 14 Oct 13 - Rejected
Effective rejection date: 02 Oct 13. Reason (249 KB)
Historic statuses 27 Aug 13 - Published
27 Aug 13 - Summary note being prepared
11 Sep 13 - Awaiting EB decision