18:29 23 May 26
Project:
0378 Xiaogushan Hydropower Project in People's Republic of China
- Request for post-registration changes
| Project | 0378 Xiaogushan Hydropower Project in People's Republic of China |
|---|---|
| PRC ref | PRC-0378-001 |
| Process track | Prior approval |
| DOE | JACO |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 11 Aug 06 - 10 Aug 16 |
| Assessment opinion |
Assessment opinion (994 KB)
|
| Revised PDD |
Revised PDD (1410 KB)
Revised PDD - track changes (1424 KB)
|
| Supplementary documents |
Appendix 1 - 0378_Xiaogushan Financial Model_20130709.xls (197 KB)
Appendix 2 - Xiaogushan Emission Reduction.xls (81 KB)
|
| Signed form |
Signed form (1280 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 14 Oct 13 -
Rejected
Effective rejection date: 02 Oct 13.
Reason (249 KB)
|
| Historic statuses |
27 Aug 13 -
Published 27 Aug 13 - Summary note being prepared 11 Sep 13 - Awaiting EB decision |

Assessment opinion
Appendix 1 - 0378_Xiaogushan Financial Model_20130709.xls
Reason
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: