Project: 9450 Installation of Waste Heat Recovery System at SO3 absorption towers by Indian Farmers Fertiliser Cooperative Ltd IFFCO, Paradeep unit, Orissa - Request for post-registration changes
Project 9450 Installation of Waste Heat Recovery System at SO3 absorption towers by Indian Farmers Fertiliser Cooperative Ltd IFFCO, Paradeep unit, Orissa
PRC ref PRC-9450-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 15 Apr 2014 - 02 Jan 2019

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 01 Nov 13 - 31 Oct 23
Assessment opinion Assessment opinion (399 KB)
Revised PDD Revised PDD (1143 KB)   Revised PDD - track changes (1145 KB)
Supplementary documents Appendix 1 - MR-CDM-9450-MR-v08-02-09-2024-Clean.pdf (2761 KB)
Appendix 2 - Revised-CDM 9450-ER calculation sheet-v08-02-09-24.xlsx (248 KB)
Signed form Signed form (187 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 27 Nov 24 - Approved
Effective approval date: 27 Nov 24
Historic statuses 29 Oct 24 - Request published