Project: 6571 Wind Power Plants Seabra, Novo Horizonte and Macaúbas CDM Project - Request for post-registration changes
Project 6571 Wind Power Plants Seabra, Novo Horizonte and Macaúbas CDM Project
PRC ref PRC-6571-001
Process track Issuance
DOE RINA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on: Increase in the capacity, Confirmation that the submission of this form is within two years of the commissioning or implementation, whichever is later
Applicable crediting period 04 Sep 12 - 03 Sep 19
Assessment opinion Assessment opinion (460 KB)
Revised PDD Revised PDD (831 KB)   Revised PDD - track changes (883 KB)
Supplementary documents
Signed form Signed form (132 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 05 May 22 - Approved
Effective approval date: 05 May 22
Historic statuses 06 Apr 22 - Request published