Project: 1601 Fujian Jiangle Gaotang Hydropower Project - Request for post-registration changes
Project 1601 Fujian Jiangle Gaotang Hydropower Project
PRC ref PRC-1601-002
Process track Issuance
DOE DTSUS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 16 Jan 09 - 15 Jan 16
Assessment opinion Assessment opinion (171 KB)
Revised PDD Revised PDD (1217 KB)   Revised PDD - track changes (1252 KB)
Supplementary documents Appendix 1 - Annex #1. New PPA, issued on 27 November 2011.pdf (725 KB)
Appendix 2 - Annex #2. Supplement PPA, ssued on 24 April 2012.pdf (27 KB)
Appendix 3 - Annex #3. 1st Revision of Monitoring Plan (approved on 23 April 2010).pdf (522 KB)
Appendix 4 - Annex #4. The name plate of the project.pdf (138 KB)
Appendix 5 - Annex #5. TL (2.67%) reference from Jan 2009 to Oct 2011.xls (38 KB)
Signed form Signed form (191 KB)
DOE clarification
VVS version VVS 2.0
Current status 06 May 13 - Approved
Effective approval date: 06 May 13
Historic statuses 05 Apr 13 - Request published