02:33 14 Nov 25
Project:
1601 Fujian Jiangle Gaotang Hydropower Project
- Request for post-registration changes
| Project | 1601 Fujian Jiangle Gaotang Hydropower Project |
|---|---|
| PRC ref | PRC-1601-002 |
| Process track | Issuance |
| DOE | DTSUS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 16 Jan 09 - 15 Jan 16 |
| Assessment opinion |
Assessment opinion (171 KB)
|
| Revised PDD |
Revised PDD (1217 KB)
Revised PDD - track changes (1252 KB)
|
| Supplementary documents |
Appendix 1 - Annex #1. New PPA, issued on 27 November 2011.pdf (725 KB)
Appendix 2 - Annex #2. Supplement PPA, ssued on 24 April 2012.pdf (27 KB)
Appendix 3 - Annex #3. 1st Revision of Monitoring Plan (approved on 23 April 2010).pdf (522 KB)
Appendix 4 - Annex #4. The name plate of the project.pdf (138 KB)
Appendix 5 - Annex #5. TL (2.67%) reference from Jan 2009 to Oct 2011.xls (38 KB)
|
| Signed form |
Signed form (191 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 06 May 13 -
Approved
Effective approval date: 06 May 13
|
| Historic statuses |
05 Apr 13 -
Request published |

Assessment opinion
Appendix 5 - Annex #5. TL (2.67%) reference from Jan 2009 to Oct 2011.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: