03:20 26 Oct 25
			
			
      Project:
      10690 102 MW Gulpur Hydropower Project
      - Request for post-registration changes
    
					| Project | 10690 102 MW Gulpur Hydropower Project | 
|---|---|
| PRC ref | PRC-10690-001 | 
| Process track | Issuance | 
| DOE | KTR | 
| Methodology(ies) and/or Standardized Baseline(s) applied at the post-registration changes | No changes | 
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) | 
| Type of submission | Corrections that do not affect project design 
 Permanent changes from the monitoring plan or the monitoring methodology 
 | 
| Applicable crediting period | 01 Sep 21 - 31 Aug 28 | 
| Assessment opinion |  Assessment opinion (1350 KB) | 
| Revised PDD |  Revised PDD (2473 KB)  Revised PDD - track changes (2477 KB) | 
| Supplementary documents | |
| Signed form |  Signed form (59 KB) | 
| DOE clarification | |
| VVS version | VVS-PA 3.0 | 
| Current status | 15 Mar 23 - Request published | 

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: