Project: 4846 Wind Power Project in Tirunelveli Tamilnadu - Request for post-registration changes
Project 4846 Wind Power Project in Tirunelveli Tamilnadu
PRC ref PRC-4846-001
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Actual operational parameters differ from the expected parameters, None of the above
Applicable crediting period 08 Jul 11 - 07 Jul 21
Assessment opinion Assessment opinion (215 KB)
Revised PDD Revised PDD (606 KB)   Revised PDD - track changes (660 KB)
Supplementary documents
Signed form Signed form (32 KB)
DOE clarification DOE clarification 1 - Final Investment Analysis_24.05.2018.xls (119 KB)
VVS version VVS-PA 1.0
Current status 11 Sep 18 - Approved
Effective approval date: 10 Sep 18
Historic statuses 23 Jul 18 - Published
06 Aug 18 - Awaiting DOE clarifications
17 Aug 18 - DOE clarifications received
17 Aug 18 - Summary note being prepared
21 Aug 18 - Awaiting EB decision