Project: 7844 5.30 MW Bundled Wind Power Project in India - Request for post-registration changes
Project 7844 5.30 MW Bundled Wind Power Project in India
PRC ref PRC-7844-001
Process track Issuance
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 23 Oct 12 - 22 Oct 22
Assessment opinion Assessment opinion (468 KB)
Revised PDD Revised PDD (1633 KB)   Revised PDD - track changes (1667 KB)
Supplementary documents
Signed form Signed form (256 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 15 Feb 23 - Approved
Effective approval date: 15 Feb 23
Historic statuses 17 Jan 23 - Request published