12:18 05 Dec 24
Project:
8474 Maracană Small Hydropower Project
- Request for post-registration changes
Project | 8474 Maracană Small Hydropower Project |
---|---|
PRC ref | PRC-8474-001 |
Process track | Issuance |
DOE | RINA |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Changes to the project or programme design
|
Applicable crediting period | 07 Dec 12 - 06 Dec 19 |
Assessment opinion | Assessment opinion (810 KB) |
Revised PDD | Revised PDD (1433 KB) Revised PDD - track changes (1482 KB) |
Supplementary documents | |
Signed form | Signed form (125 KB) |
DOE clarification | |
VVS version | VVS 7.0 |
Current status | 14 Jan 16 -
Approved
Effective approval date: 14 Jan 16
|
Historic statuses |
16 Dec 15 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: