Project: 9741 Cabo Leones Wind Farm - Request for post-registration changes
Project 9741 Cabo Leones Wind Farm
PRC ref PRC-9741-001
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Changes to the project or programme design
  • Changes have an impact on:

Change to the start date of the crediting period
  • Proposed start date of crediting period: 12 Jun 2018
Applicable crediting period 12 Jun 18 - 11 Jun 25
Assessment opinion Assessment opinion (374 KB)
Revised PDD Revised PDD (3844 KB)   Revised PDD - track changes (4232 KB)
Supplementary documents Appendix 1 - PRC-9741-001_Withdrawal form Signed.pdf (237 KB)
Appendix 2 - 210324 IRR_Cabo Leones_.xls (598 KB)
Appendix 3 - CABO LEONES_ER Calculation_ex ante.xlsx (219 KB)
Appendix 4 - EF calculation Cabo Leones.xlsx (6423 KB)
Signed form Signed form (127 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 17 Aug 21 - Withdrawn
Effective approval date: 15 Aug 21
Historic statuses 28 Jun 21 - Published
28 Jun 21 - Summary note being prepared