12:08 09 Nov 25
Project:
9741 Cabo Leones Wind Farm
- Request for post-registration changes
| Project | 9741 Cabo Leones Wind Farm |
|---|---|
| PRC ref | PRC-9741-001 |
| Process track | Prior approval |
| DOE | Earthood |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
Change to the start date of the crediting period
|
| Applicable crediting period | 12 Jun 18 - 11 Jun 25 |
| Assessment opinion |
Assessment opinion (374 KB)
|
| Revised PDD |
Revised PDD (3844 KB)
Revised PDD - track changes (4232 KB)
|
| Supplementary documents |
Appendix 1 - PRC-9741-001_Withdrawal form Signed.pdf (237 KB)
Appendix 2 - 210324 IRR_Cabo Leones_.xls (598 KB)
Appendix 3 - CABO LEONES_ER Calculation_ex ante.xlsx (219 KB)
Appendix 4 - EF calculation Cabo Leones.xlsx (6423 KB)
|
| Signed form |
Signed form (127 KB)
|
| DOE clarification |
|
| VVS version | VVS-PA 2.0 |
| Current status | 17 Aug 21 -
Withdrawn
Effective approval date: 15 Aug 21
|
| Historic statuses |
28 Jun 21 -
Published 28 Jun 21 - Summary note being prepared |

Assessment opinion
Appendix 2 - 210324 IRR_Cabo Leones_.xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: