11:57 27 Dec 24
Project:
9741 Cabo Leones Wind Farm
- Request for post-registration changes
Project | 9741 Cabo Leones Wind Farm |
---|---|
PRC ref | PRC-9741-001 |
Process track | Prior approval |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 12 Jun 18 - 11 Jun 25 |
Assessment opinion | Assessment opinion (374 KB) |
Revised PDD | Revised PDD (3844 KB) Revised PDD - track changes (4232 KB) |
Supplementary documents |
Appendix 1 - PRC-9741-001_Withdrawal form Signed.pdf (237 KB)
Appendix 2 - 210324 IRR_Cabo Leones_.xls (598 KB) Appendix 3 - CABO LEONES_ER Calculation_ex ante.xlsx (219 KB) Appendix 4 - EF calculation Cabo Leones.xlsx (6423 KB) |
Signed form | Signed form (127 KB) |
DOE clarification |
|
VVS version | VVS-PA 2.0 |
Current status | 17 Aug 21 -
Withdrawn
Effective approval date: 15 Aug 21
|
Historic statuses |
28 Jun 21 -
Published 28 Jun 21 - Summary note being prepared |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: