20:07 22 Feb 25
Project:
1326 Jorethang Loop Hydroelectric Project, India
- Request for post-registration changes
Project | 1326 Jorethang Loop Hydroelectric Project, India |
---|---|
PRC ref | PRC-1326-001 |
Process track | Prior approval |
DOE | EPIC |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
Change to the start date of the crediting period
|
Applicable crediting period | 01 Jan 12 - 31 Dec 18 |
Assessment opinion | Assessment opinion (440 KB) |
Revised PDD | Revised PDD (1448 KB) Revised PDD - track changes (1461 KB) |
Supplementary documents |
![]() |
Signed form | Signed form (138 KB) |
DOE clarification | |
VVS version | VVS 9.0 |
Current status | 16 Sep 16 -
Approved
Effective approval date: 14 Sep 16
|
Historic statuses |
09 Aug 16 -
Published 09 Aug 16 - Summary note being prepared 25 Aug 16 - Awaiting EB decision |