Project: 3405 Sichuan Baoxing Liuheba Small Scale Hydropower Project - Request for post-registration changes
Project 3405 Sichuan Baoxing Liuheba Small Scale Hydropower Project
PRC ref PRC-3405-001
Process track Prior approval
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 08 Nov 10 - 07 Nov 17
Assessment opinion Assessment opinion (373 KB)
Revised PDD Revised PDD (3362 KB)   Revised PDD - track changes (3374 KB)
Supplementary documents
Signed form Signed form (57 KB)
DOE clarification
VVS version VVS 2.0
Current status 04 Feb 14 - Approved
Effective approval date: 04 Feb 14
Historic statuses 31 Dec 13 - Published
31 Dec 13 - Summary note being prepared
14 Jan 14 - Awaiting EB decision