Project: 8759 Providencia III: 9.11MW Small Hydro Power Generation Plant - Request for post-registration changes
Project 8759 Providencia III: 9.11MW Small Hydro Power Generation Plant
PRC ref PRC-8759-001
Process track Prior approval
DOE ICONTEC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 12 Mar 2015 - 31 Dec 2020

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on:

Change to the start date of the crediting period
  • Proposed start date of crediting period: 12 Mar 2015
Applicable crediting period 12 Mar 15 - 11 Mar 22
Assessment opinion Assessment opinion (417 KB)
Revised PDD Revised PDD (2501 KB)   Revised PDD - track changes (2028 KB)
Supplementary documents Appendix 1 - Copia de calculo ER con FE original 24092020.xlsx (15 KB)
Signed form Signed form (543 KB)
DOE clarification DOE clarification 1 - Respuesta request proviencia III.pdf (129 KB)
VVS version VVS-PA 2.0
Current status 20 Nov 20 - Approved
Effective approval date: 19 Nov 20
Historic statuses 28 Sep 20 - Published
12 Oct 20 - Awaiting DOE clarifications
16 Oct 20 - DOE clarifications received
16 Oct 20 - Summary note being prepared
30 Oct 20 - Awaiting EB decision