Project: 8054 DaKrong 2 Hydropower Project - Request for post-registration changes
Project 8054 DaKrong 2 Hydropower Project
PRC ref PRC-8054-002
Process track Issuance
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 28 Feb 13 - 27 Feb 23
Assessment opinion Assessment opinion (286 KB)
Revised PDD Revised PDD (1103 KB)   Revised PDD - track changes (1153 KB)
Supplementary documents
Signed form Signed form (152 KB)
DOE clarification
VVS version VVS 9.0
Current status 03 Nov 16 - Approved
Effective approval date: 03 Nov 16
Historic statuses 05 Oct 16 - Request published