Project: 2650 Biogas project, BAJ Terbanggi - Request for post-registration changes
Project 2650 Biogas project, BAJ Terbanggi
PRC ref PRC-2650-002
Process track Issuance
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2013 - 31 Dec 2014

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 18 Oct 10 - 17 Oct 17
Assessment opinion Assessment opinion (164 KB)
Revised PDD Revised PDD (529 KB)   Revised PDD - track changes (528 KB)
Supplementary documents
Signed form Signed form (216 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Feb 15 - Approved
Effective approval date: 27 Feb 15
Historic statuses 29 Jan 15 - Request published