Project: 2638 VN08-WWS-03, Methane Recovery and Biogas Utilization Project, Yen Bai Province, Vietnam - Request for post-registration changes
Project 2638 VN08-WWS-03, Methane Recovery and Biogas Utilization Project, Yen Bai Province, Vietnam
PRC ref PRC-2638-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 21 Dec 10 - 20 Dec 17
Assessment opinion Assessment opinion (295 KB)
Revised PDD Revised PDD (1325 KB)   Revised PDD - track changes (1324 KB)
Supplementary documents
Signed form Signed form (117 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 13 Mar 19 - Approved
Effective approval date: 13 Mar 19
Historic statuses 12 Feb 19 - Request published