16:41 27 Dec 24
Project:
2023 Nimoo-Bazgo Hydroelectric Project
- Request for post-registration changes
Project | 2023 Nimoo-Bazgo Hydroelectric Project |
---|---|
PRC ref | PRC-2023-001 |
Process track | Issuance |
DOE | KBS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
Applicable crediting period | 31 Jul 11 - 30 Jul 18 |
Assessment opinion | Assessment opinion (398 KB) |
Revised PDD | Revised PDD (1745 KB) Revised PDD - track changes (1437 KB) |
Supplementary documents | |
Signed form | Signed form (251 KB) |
DOE clarification | |
VVS version | VVS-PA 2.0 |
Current status | 14 May 21 -
Approved
Effective approval date: 14 May 21
|
Historic statuses |
14 Apr 21 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: