16:28 09 Apr 23
Project:
2023 Nimoo-Bazgo Hydroelectric Project
- Request for post-registration changes
| Project | 2023 Nimoo-Bazgo Hydroelectric Project |
|---|---|
| PRC ref | PRC-2023-001 |
| Process track | Issuance |
| DOE | KBS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 31 Jul 11 - 30 Jul 18 |
| Assessment opinion |
Assessment opinion (398 KB)
|
| Revised PDD |
Revised PDD (1745 KB)
Revised PDD - track changes (1437 KB)
|
| Supplementary documents | |
| Signed form |
Signed form (251 KB)
|
| DOE clarification | |
| VVS version | VVS-PA 2.0 |
| Current status | 14 May 21 -
Approved
Effective approval date: 14 May 21
|
| Historic statuses |
14 Apr 21 -
Request published |

Assessment opinion
Join the Climate Neutral Now initiative:
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: