Project: 1175 9.8 MW Renewable Energy Generation for the grid at South Asian Agro Industries Limited in Raipur District, Chattisgarh. - Request for post-registration changes
Project 1175 9.8 MW Renewable Energy Generation for the grid at South Asian Agro Industries Limited in Raipur District, Chattisgarh.
PRC ref PRC-1175-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Feb 08 - 31 Jan 18
Assessment opinion Assessment opinion (79 KB)
Revised PDD Revised PDD (12 MB)   Revised PDD - track changes (12 MB)
Supplementary documents Appendix 1 - Annex 1_SAAIL_MOC_06-08-12.pdf (433 KB)
Signed form Signed form (218 KB)
DOE clarification
VVS version VVS 2.0
Current status 30 Oct 12 - Approved
Effective approval date: 29 Oct 12
Historic statuses 25 Sep 12 - Published
25 Sep 12 - Summary note being prepared
09 Oct 12 - Awaiting EB decision