Project:
2876 Lahendong II-20 MW Geothermal Project
- Request for post-registration changes
Project | 2876 Lahendong II-20 MW Geothermal Project |
---|---|
PRC ref | PRC-2876-001 |
Process track | Prior approval |
DOE | AENOR |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Temporary deviations from the monitoring plan or the monitoring methodology
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 19 Dec 09 - 18 Dec 16 |
Assessment opinion | Assessment opinion (486 KB) |
Revised PDD | Revised PDD (1525 KB) Revised PDD - track changes (1673 KB) |
Supplementary documents |
Appendix 1 - Lahendong _II_09_10_Spreadsheet Calculation.xls (622 KB)
|
Signed form | Signed form (730 KB) |
DOE clarification |
DOE clarification 1 - Validation Post registration changes Lahendong version 05_tracked changes.pdf (488 KB)
DOE clarification 2 - Formula Diesel Fuel Tank measurement 2009_2010.xls (154 KB) |
VVS version | VVS 2.0 |
Current status | 18 Dec 13 -
Approved
Effective approval date: 18 Dec 13
|
Historic statuses |
24 Sep 13 -
Published 05 Nov 13 - Awaiting DOE clarifications 15 Nov 13 - DOE clarifications received 15 Nov 13 - Summary note being prepared 27 Nov 13 - Awaiting EB decision |