Project: 9925 SHPs Tambaś, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil - Request for post-registration changes
Project 9925 SHPs Tambaś, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil
PRC ref PRC-9925-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 27 Feb 2016 - 10 Mar 2019

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 Jul 14 - 09 Jul 21
Assessment opinion Assessment opinion (247 KB)
Revised PDD Revised PDD (1811 KB)   Revised PDD - track changes (1814 KB)
Supplementary documents
Signed form Signed form (144 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 15 Mar 19 - Approved
Effective approval date: 15 Mar 19
Historic statuses 14 Feb 19 - Request published