Project: 5664 CLP Penglai Wind Power Phase I Project - Request for post-registration changes
Project 5664 CLP Penglai Wind Power Phase I Project
PRC ref PRC-5664-001
Process track Issuance
DOE JQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 13 Jan 12 - 12 Jan 19
Assessment opinion Assessment opinion (114 KB)
Revised PDD Revised PDD (940 KB)   Revised PDD - track changes (897 KB)
Supplementary documents Appendix 1 - Registered PDD changed form (ver.03 to ver.04.1).pdf (938 KB)
Signed form Signed form (80 KB)
DOE clarification
VVS version VVS 2.0
Current status 27 Sep 13 - Approved
Effective approval date: 27 Sep 13
Historic statuses 29 Aug 13 - Request published