Project: 3317 Tongliao Biogas Recovery and Utilization Project in Inner Mongolia Autonomous Region - Request for post-registration changes
Project 3317 Tongliao Biogas Recovery and Utilization Project in Inner Mongolia Autonomous Region
PRC ref PRC-3317-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 10 Aug 11 - 09 Aug 21
Assessment opinion Assessment opinion (1187 KB)
Revised PDD Revised PDD (1322 KB)   Revised PDD - track changes (1323 KB)
Supplementary documents
Signed form Signed form (902 KB)
DOE clarification
VVS version VVS 2.0
Current status 24 Jun 13 - Approved
Effective approval date: 24 Jun 13
Historic statuses 24 May 13 - Request published